NERC RC/TO/BA, CEM & FE Engineering: practice drill
10 realistic exam questions, graded as you go, with the exact rule or statute citation for every answer. Start free, no sign-up.
Timed mock exam
28 questions in 34 minutes, drawn from every topic. No answers shown until the end, then a full score breakdown, your weakest topics and a review of what you missed.
Prices are in US dollars, plus tax where it applies. Stripe, our payment processor, calculates tax at checkout.
All sales are final. If something is really wrong, such as a duplicate charge or a purchase that does not unlock what you bought, write to support@careerexampro.com and we will put it right.
One-time payment. Nothing renews.
You have an exam ticket for this practice test. Start the timed mock exam to use it.
Exact question counts, passing scores, and allowed reference materials vary by testing window and state/agency. Always confirm current rules with the official testing provider.
Sample questions
Under NERC Reliability Standard BAL-001-2 (Real Power Balancing Control Performance), what are the two mandatory compliance criteria governing a Balancing Authority's long-term CPS1 performance and real-time Balancing Authority ACE Limit (BAAL)?
CPS1 must remain >= 90% on a rolling monthly basis, and clock-minute ACE must not exceed BAAL for more than 15 consecutive minutes.
CPS1 must remain >= 100% on a rolling 30-day basis, and clock-minute ACE must return to zero within 10 minutes of any BAAL excursion.
CPS1 >= 100% over a rolling 12-month period, and clock-minute ACE must not exceed BAAL for > 30 consecutive minutes.
CPS1 must remain >= 95% over a rolling 12-month period, and BAAL applies only when Interconnection frequency falls below 59.95 Hz.
Show the answer
C. CPS1 >= 100% over a rolling 12-month period, and clock-minute ACE must not exceed BAAL for > 30 consecutive minutes.
NERC BAL-001-2 Requirement R1 mandates that each Balancing Authority achieve a Control Performance Standard 1 (CPS1) score of at least 100% over every rolling 12-month period. Requirement R2 establishes the dynamic, frequency-dependent Balancing Authority ACE Limit (BAAL_Low and BAAL_High): a BA's clock-minute average ACE may not exceed its BAAL for more than 30 consecutive clock-minutes.
Reference: NERC BAL-001-2 (Real Power Balancing Control Performance), Requirements R1 & R2
A steam turbine generator rated at 450 MW is operating online at 360 MW with a 5% governor droop setting on a 60.00 Hz Interconnection (assume negligible governor deadband). Following a major transmission and generation disturbance, steady-state Interconnection frequency settles at 59.80 Hz. Assuming the unit is not blocked from governor response, what is its new real power output?
390 MW, reflecting a +30 MW primary governor response.
384 MW, reflecting a +24 MW response scaled to its 360 MW dispatch.
330 MW, reflecting a -30 MW automatic unloading to protect turbine blades.
450 MW, because any frequency deviation below 59.95 Hz drives the governor valve fully open to maximum rated output.
Show the answer
A. 390 MW, reflecting a +30 MW primary governor response.
A 5% droop on a 60 Hz system corresponds to a 0.05 x 60 = 3.0 Hz frequency change for a 100% swing of rated capacity (450 MW), not current output. Using delta_P = -(delta_F / (F_nom * R)) * P_rated = -((-0.20) / 3.0) * 450 = +30 MW. Since the unit has 450 - 360 = 90 MW of available headroom, its output increases from 360 MW to 390 MW.
Reference: NERC Balancing and Frequency Control Reference Document / IEEE Std 122 (Governor Droop)
Under NERC TOP-001-5, TOP-002-4, and IRO-008-2, how do Real-Time Assessments (RTAs) and Next-Day Operational Planning Analyses (OPAs) work together to maintain Bulk Electric System reliability?
An OPA is executed every 15 minutes by the SCADA EMS, whereas an RTA is performed once daily before 14:00 to validate day-ahead market schedules.
An OPA assesses next-day conditions for Operating Plans, while an RTA runs at least every 30 minutes for real-time reliability.
An RTA is required only after an IROL exceedance occurs, whereas an OPA is conducted weekly to update seasonal transmission thermal ratings.
Both OPAs and RTAs are delegated exclusively to Balancing Authorities, while Transmission Operators perform switching studies only during emergencies.
Show the answer
B. An OPA assesses next-day conditions for Operating Plans, while an RTA runs at least every 30 minutes for real-time reliability.
NERC TOP-002-4 and IRO-008-2 require Transmission Operators and Reliability Coordinators to perform an Operational Planning Analysis (OPA) to assess whether next-day planned operations can meet reliability criteria and to develop Operating Plans for identified SOL/IROL issues. In real time, TOP-001-5 (R13) and IRO-008-2 (R4) mandate performing a Real-Time Assessment (RTA) at least once every 30 minutes to evaluate current system conditions and contingencies.